Cancel
Projects

Recent projects by Columbus Engineering Consultants, Inc. (CEC), an award-winning consulting firm specializing in Structural and Civil Engineering, Sub-surface Utility Engineering, Survey and Right-of-Way Design.

Lincoln Theatre Phases I & II

14Feb

in
Written by rhennen

CEC prepared design documents for the improvement of the Lincoln Theatre area in accordance with the City’s continuing efforts to improve and rehabilitate this historical district and the surrounding neighborhood. Phase I Design: Work included survey & SUE work; ADA curb ramps, curb, sidewalk along the east side of Hamilton Ave., the south side of […]

Continue Reading

Groves Road

14Feb

in
Written by rhennen

The City of Columbus contracted CEC to prepare a brief report to widen and improve Groves Road, between Courtright and Hamilton Roads. Scope included a study to evaluate installing curbs and sidewalks along the improved section of the road. CEC prepared a report detailing the site condition with alternate recommendations (including sidewalks, curbs, and enclosed […]

Continue Reading

Group 10 Intersections

14Feb

in
Written by rhennen

The City of Columbus selected CEC to prepare draft report and construction design documents to re-habilitate and widen five arterial roads at different location throughout the City of Columbus, Cooper Rd. (two locations totaling 3500’), Hudson St. (1300’), Hines Rd. and Tussing Rd. (1600’), and Trabue Rd. and Walcutt Rd. (4000’). CEC prepared reports evaluating […]

Continue Reading

South 4th St. Sidewalks, Curb, ADA Curb Ramps & Road Diets

14Feb

in
Written by rhennen

A task order was issued by the City of Columbus to prepare design documents to replace existing deteriorated curbs and sidewalks along South 4th Street, between Morrill Avenue and Hanford Street. In addition, the City asked for various traffic calming devices to enhance pedestrian safety and reduce speeding vehicles. The design plans included decorative concrete-brick […]

Continue Reading

West Broad ADA Curb Ramps, FRA-40-8.59 Part-2

14Feb

in
Written by rhennen

This project was assigned to CEC as a task order to evaluate the existing curb ramp compliance with the current guidelines, existing sidewalk conditions, and existing curbs along West Broad Street between Hague and Central Avenues, and preparation of construction design documents to replace non-compliant ADA curb ramps, deteriorated sidewalks and curbs. Work included taking […]

Continue Reading