Bachelor of Science, Civil Engineering, Ohio
University, 1973
Registered
Professional Engineer, State of Ohio # 39624
Summary Experience:
Mr.
Hedrick has 33 years of experience in the field of Transportation Planning and
Design, 29 of those years with the Ohio Department of Transportation Districts 5
and 10. During his career he has managed a multitude of projects ranging
from highway corridor studies to bridge replacements, roadway widening, new
alignment projects, and interchange additions. Mr. Hedrick was responsible
for review and ODOT project management of more than 100 bridge replacement,
roadway realignment and new location projects prepared by consultants during his
tenure with ODOT. He has extensive experience in the public involvement
portion of the NEPA process as well as environmental document preparation.
Over his career Mr. Hedrick has been involved in the design of industrial access
roads in Guernsey, Athens, and Washington County.
Representative
past projects as a Consulting Engineer include:
BEL-149-0.00
(Washington Street Relocation) – Bellaire, OH–
Assistant Project Manager for Preliminary Development Phase to develop new
location for SR 149 as it enters the town to intersect with SR 7 at the
Ohio River.Project included
Steps 2 through 8 of the ODOT Transportation Development Process,
including environmental studies and documentation, preliminary engineering
for a range of feasible alternatives, public involvement, and probable
preparation of a Categorical Exclusion (CE Level 4).The primary purpose of the project is to alleviate safety problems
associated with heavy trucking in close proximity with residential
housing, and potential landslide conditions.
Client: City of
Bellaire
FRA-ROBERTS
ROAD- Hilliard-Rome Road to IR-270
– Project for the preparation of the CE re-evaluation for this widening
and pavement reconstruction project.Original document had to be re-evaluated due to the length of time
that had passed since it's preparation and approval.The re-evaluation resulted in a new document being prepared to
update the format and account for changed field conditions.Client: City of Columbus
CLI-380-00.32-
Clinton County, OH
–
Project
Manager for preparation of roadway plans, maintenance of traffic and
drainage details for the replacement of one structure over a stream.
Client: ODOT District Eight
WAR-73-8.82- Warren County, OH –
Project Manager for preparation of roadway plans, maintenance of traffic,
drainage details and right of way plans for the replacement of one
structure over a stream.
Client:
ODOT District Eight
ALL-75-18.36-
Allen County, OH–
Project
Manager for preparation of roadway approach plans, maintenance of traffic
and drainage details for a complete deck replacement as a design-build
project on a bridge over Interstate 75.Client: ODOT District One
VAN-127-12.39/13.54/15.17-
Van Wert County, Ohio–
Project Manager
for preparation of roadway approach plans, maintenance of traffic and
drainage details for the replacement of three bridges over streams as a
design-build project.Client:
ODOT District One
GUE-660-4.98/5.18-
Guernsey County, OH–
Project Manager
for preparation of roadway plans, maintenance of traffic and drainage
details for the replacement of two bridges over streams as a design-build
project.Client: ODOT
District Five
FRA-70-13.22- Franklin
County, Ohio–Assistant Project
Manager for preparation of roadway plans, maintenance of traffic and
traffic control for the rehabilitation of two bridges over the Scioto
River in the City of Columbus. Client:
ODOT District Six
HAM-27-10.28/16.48/18.03-
Hamilton County, OH –Assistant
Project Manager for preparation of roadway plans, maintenance of traffic
and traffic control for the rehabilitation of three bridges.
Client:
ODOT District Eight
MAD-40-0.92-
Madison County, OH –
Project
Manager for preparation of roadway approach plans, maintenance of traffic
and drainage details for the replacement of twin bridges over a stream.